not completed 2004, Leipzig

co-author A.D.N.S. architekti

cooperation Juraj Sonlajtner

Urban Design of the Olympic Village Leipzig 2012.

The solution was to bridge the watercourse with twelve residential bridges - houses whose designed capacity met the needs of the Olympic Village.

The project also addressed the issue of how to deal with the area after the Olympics.

More